Year | Contract name | Employer |
---|---|---|
2006 | Performance of works on construction of the reservoir “Gajani” for water supply system of Maglajani spring Reservoir V=1000 m3 | Municipality of Laktasi |
2007 | Execution of works on construction of regulation of a part of riverbed of Siroka river (from the end of an existing regulation to the bridge in Mlade Cusica St.) in Banja Luka | City of Banja Luka |
2002-2006 | Execution of works on a part of water supply system from Povelic spring northern part of the Municipality of Prnjavor-LC Sibovska, V.Ilova, Grabik (1.609.120,56+801.305,85) -PEHD pipeline Ø 160-335 – 9,9 km; - Reservoirs V=2x500 m3 - Pumping stations 2x36,4 l/s. Execution of works on a part of water supply system from Povelic spring northern part of the Municipality of Prnjavor-LC Sibovska, V. Ilova, Grabik (1.609.120,56+801.305,85) - PEHD pipeline Ø 160-335 – 9,9 km; - Reservoirs V=2x500 m3 Pumping stations 2x36,4 l/s |
Municipality of Prnjavor |
2008 | Transport pipeline and distributive network on the section Vrbaska – Podgradci -PEHD pipeline Ø40-315; 119,03 km; -3 pumping stations 28,5 l/s; -2 reservoirs V=50 and V=300 m3. |
Water supply and sewerage system Gradiska |
2008 | Delivery, installation and performance of outdoor water supply and sewerage system Pevec d.o.o. | Banja Luka |
2011 | Performance of works on construction of water supply system in the Municipality of Laktasi (3.197.024,87+572.080,28+1.075.828,19) -PEHD pipeline Ø 160-400 80,82 km; 3 reservoirs 500 m3 and 2x100 m3; pumping and chlorine stations 2x3,9l/s and 2x18,05 l/s |
Strabag AG |
2010 | Construction of primary pipeline Ø 800 mm in Zapadni transit (section from Trive Amelice St. concluded with roundabout) -DCI pipeline 0,70 km |
City of Banja Luka |
2011 | Water supply of second high altitude zone in settlement Cesma (works on a reservoir of 1000 m3, equipment and electrical works and equipment for pumping station) -reservoir V=1000 m3 |
City of Banja Luka |
2014 | Reconstruction and expansion of water supply network in Poljavnice, Ravnice and Vodicevo neighborhood, municipality of Novi Grad Construction of water supply network: -PEHD pipeline from Ø 25 mm to Ø160 mm, 34,81 km -Pumping station -Reservoir V=100 m3 |
Municipality of Novi Grad |
2012-2013 | Urban water supply and sewerage system, Banja Luka Lot 1 – water supply -PEHD pipeline DN 63-225 – 11,90 km, -DCI pipeline DN 350 and 500 – 5,5 km, -House connections – 1080 pcs -reconstruction of traffic route |
City of Banja Luka |
2014-2015 | Construction and reconstruction of water supply system in municipality of Laktasi – first phase LOT 1 -PEHD pipeline from Ø25 mm to Ø315 mm, 103,00 km -pumping station -reservoir V = 100 m3 |
Municipality of Laktasi |
2011- | Performance of works on regional water supply “Crno Vrelo” (Donji Pervan-Petrov Gaj) for Lot 1 Shared facilities -PEHD pipeline 23,77 km; -reservoir 500m3; -booster device with three pumps 11l/s; -water sedimentation tank; technological equipment and remote control |
Center for development and advancement of village and Municipality of Prijedor |
2016 | Reconstruction of urban water supply network, sanitary protection of Mlakva spring and construction of primary water supply network Rudice and Blatna | Municipality of Novi Grad |
2015- | Reconstruction and expansion of water supply system in the town of Prijedor | Town of Prijedor |